When is a plant relocation planned?
A plant relocation is due when the current site no longer meets the requirements placed on it or a site decision has already been made — for example when capacity reaches its limits, the existing structure permanently blocks key objectives, several sites produce similar products without a justified split, or the manufacturing strategy has decided which scope will be produced at which site.
Approach
- Feasibility and direction: relocation and conversion of the existing site are compared over the same period and the same volume scenarios, including transition costs, productivity losses and start-up.
- Capture the existing facilities: both sites are documented comparably, for example with 3D scanning.
- Plan the target layout following the factory planning procedure.
- Sequence the moves: for each step, the permissible production loss, required buffers, responsibilities, release criteria and a fallback option are defined.
- Prepare realization: the roadmap runs from investment approval through tendering and procurement to commissioning; the lead time for building up buffer stock is planned early.
- Switch over and accept: acceptance, start-up sequence and fallback options control the transition.
- Stabilize ramp-up until the targets for quality, volume, utilization and cost are reached.
Results / deliverables
- Decision paper: relocation versus conversion of the existing site
- Documentation of both sites
- Target layout with supply and distribution concept
- Move plan with criteria and fallback option per step
- Buffer stock planning with lead times
- Implementation roadmap through to commissioning
- Acceptance and start-up concept through to stable ramp-up