Service

Plant relocation

From feasibility through the move sequence to recommissioning — planned so that ongoing operations are disrupted as little as possible.

In brief

Bross Consulting plans plant relocations so that ongoing operations are disrupted as little as possible — from the feasibility check through the move sequence to recommissioning and ramp-up at the new site. For each move step, the permissible production loss, required buffers, responsibilities, release criteria and a fallback option are defined. The result is a verifiable relocation plan aligned with the target layout, buffer stock and implementation roadmap.

When is a plant relocation planned?

A plant relocation is due when the current site no longer meets the requirements placed on it or a site decision has already been made — for example when capacity reaches its limits, the existing structure permanently blocks key objectives, several sites produce similar products without a justified split, or the manufacturing strategy has decided which scope will be produced at which site.

Approach

  1. Feasibility and direction: relocation and conversion of the existing site are compared over the same period and the same volume scenarios, including transition costs, productivity losses and start-up.
  2. Capture the existing facilities: both sites are documented comparably, for example with 3D scanning.
  3. Plan the target layout following the factory planning procedure.
  4. Sequence the moves: for each step, the permissible production loss, required buffers, responsibilities, release criteria and a fallback option are defined.
  5. Prepare realization: the roadmap runs from investment approval through tendering and procurement to commissioning; the lead time for building up buffer stock is planned early.
  6. Switch over and accept: acceptance, start-up sequence and fallback options control the transition.
  7. Stabilize ramp-up until the targets for quality, volume, utilization and cost are reached.

Results / deliverables

  • Decision paper: relocation versus conversion of the existing site
  • Documentation of both sites
  • Target layout with supply and distribution concept
  • Move plan with criteria and fallback option per step
  • Buffer stock planning with lead times
  • Implementation roadmap through to commissioning
  • Acceptance and start-up concept through to stable ramp-up

FAQ

Frequently asked questions

When should Bross Consulting be involved in a plant relocation?

Most effectively before the site and layout decision. A feasibility study then examines whether the relocation is technically and economically viable, and the move sequence becomes a criterion in the option evaluation — not only after the layout has been approved.

Can production continue during a plant relocation?

How much production is possible during the move is defined for each move step: permissible production loss, required buffers and a fallback option. Buffer stock built up in good time maintains delivery capability while equipment is moved. The aim of the planning is to disrupt ongoing operations as little as possible.

Does Bross Consulting also support implementation of the relocation?

Bross Consulting supports plant relocations beyond planning on request. Project management and a PMO steer schedules, costs and interfaces; as general planner, Bross takes overall responsibility across the trades through to commissioning and ramp-up.